The tunnel will be constructed 60 to 70 feet underground using a roadheader, which cuts through rock. The access for the excavation necessary for the tunnel will be between Fourth and Fifth streets, a central point along the approximately one mile route of the tunnel. As a result, the excavation will not require trenching. Further, individuals on the surface will likely not realize excavation is taking place far below them.