CURRENT OPEN SOLICITATIONS

List of Current Solicitations
Solicitation Number / Description(s) Due Date  
IFB 6100 CLMC643 
Walnut Creek WWTP Secondary Process Improvements
The Scope of Work includes furnishing all tools, labor, materials, equipment and miscellaneous items necessary for the complete construction of the Work. Work shall include: 1) Repair and/or replacement of various equipment including replacement of numerous valves, scum and sludge pumps, clarifier mechanisms, control panels; and repair of cracks and joints in various basins and other miscellaneous items. 2) Installation of a permanent lime slurry feed for alkalinity addition. 3) Improvement of diffused air system in the Flocculation Basins. 4) Expansion of the Chlorine contact basin and improvements to the filter junction box. 5) Repair and installation of diffused air system in Aeration basins. 6) Repair of various leaks on buried air piping.
06/14/2018 View Details
IFB 6100 CLMC712 
Hornsby Bend Biosolids Mgt. Plant Thickener Complex Rehab
The installation of three new 450 gallon per minute (gpm) Thickening Centrifuges within the existing Thickener Complex to replace four of the existing Gravity Belt Thickeners (GBTs). The Work also consists of the construction and installation of a new electrical room inside the thickening complex, designed to house a new Motor Control Center (MCC) and electrical control panels associated with the centrifuges (sized for future centrifuge panels as well). In addition, the installation of new electrical wiring for power to the remaining GBTs and their ancillary equipment is provided from the existing MCCs, and improvements will be made to the existing MCC due to corrosion. A new transformer sized for current and future loads will replace the existing transformer. Miscellaneous Instrumentation/SCADA improvements are also planned. Finally, HVAC improvements will be provided for the existing electrical room, existing thickening area, and proposed electrical room to reduce corrosive gases. The existing Flow Equalization Basin (FEB) will be cleaned and all sludge removed. As an allowance, the FEB will be repaired and recoated as deemed necessary.
06/07/2018 View Details
RFQS 6100 CLMA025 
AFD Locker Room Project Phase 6
The City of Austin is requesting Statements of Qualifications for Design-Build services to furnish design and construction services for all Work required for AFD Locker Room Project Phase 6 at the following six (6) locations: Fire Station #2 at 506 W. Martin Luther King, Jr. Blvd; Fire Station #9 at 4301 Speedway; Fire Station #10 at 3009 Windsor Rd; Fire Station #11 at 1605 Kinney Ave; Fire Station #12 at 2109 Hancock Drive and Fire Station #16 at 7000 Reese Lane. The Work consists of renovations with minor additions to six (6) fire stations in various ages and building size. The work will include but is not limited to the following: modifications to interior partitions, rooms, elevator, stairs, cabinetry, millwork, doors, flooring, ceiling, walls, painting, exterior windows, plumbing, HVAC, electrical power and lighting.
05/30/2018 View Details
IFB 6100 CLMC706 
Loop Detector Repair IDIQ (North)
The main scope of work is to repair existing loop detectors on various roadways in the City of Austin north of the Colorado River; including, but not limited to, cutting slots with a masonry cutting disc or similar device, placing wires, and filling the slots with loop sealant. Contractor will be responsible for pulling loop wire through the existing loop stubout and conduit into the pullbox and clearly labeling the cable using the City of Austin’s color codes. Locations will vary based on the City of Austin Transportation Department’s maintenance schedule. Work assignments associated with this contract will occur north of the Colorado River and within the limits of the City of Austin.
05/24/2018 View Details
IFB 6100 CLMC707 
Loop Detector Repair IDIQ (South)
The main scope of work is to repair existing loop detectors on various roadways in the City of Austin south of the Colorado River; including, but not limited to, cutting slots with a masonry cutting disc or similar device, placing wires, and filling the slots with loop sealant. Contractor will be responsible for pulling loop wire through the existing loop stubout and conduit into the pullbox and clearly labeling the cable using the City of Austin’s color codes. Locations will vary based on the City of Austin Transportation Department’s maintenance schedule. Work assignments associated with this contract will occur south of the Colorado River and within the limits of the City of Austin.
05/24/2018 View Details
Office Information
Image of a map snapshot for the location of the Municipal Building.
Central Purchasing
Contact Information
(512)974-2500 (Phone)
(512)974-2388 (Fax)
(512)974-2500 (Bid Packets)
(512)974-2018 (Vendor Registration)

Mailing Address
P.O. Box 1088
Austin, TX 78767

Location
Municipal Building
124 W. 8th Street, Room 308
Austin, TX 78701-2302
Capital Contracting Office
Contact Information
(512)974-7181 (Phone)
(512)974-7297 (Fax)
(512)974-7151 (Bid Packets)

Location & Mailing Address
505 Barton Springs Rd., Suite 1045
Austin, TX 78704
Solicitations RSS Feed
Important Notices
The State of Texas has enacted a new law that concerns Vendors doing business with local governments effective January 1, 2006. All Vendors must now register with the City of Austin before they submit a bid or proposal. Please take the time to read the information in the Conflict of Interest Disclosure: http://www.austintexas.gov/department/conflict-interest-questionnaire.
City of Austin employees may not accept any gifts from vendors. Please do not offer or provide gifts or favors to City employees or to City offices. This includes paying for meals.
On October 2, 1995, a revision to the City's Minority Business Enterprise (MBE) / Woman-owned Business Enterprise (WBE) / Disadvantaged Business Enterprise (DBE) Ordinance became effective.
The Ordinance establishes new goals for MBE / WBE / DBE Participation. Bidders are required to document efforts to solicit MBE / WBE / DBEs in the Compliance Plan. The Goals for each project and the instructions and forms for the Compliance Plan are included in the MBE / WBE / DBE Program Packet included in the solicitation. For construction contracts, the MBE / WBE / DBE Program Packet is a separately bound volume of the Project Manual.
On December 6, 2007, Council amended Chapter 2-7, adding Article 6 Anti-Lobbying and Procurement. Please read the new ordinance here.
ALL BIDS AND COMPLIANCE PLANS NOT RECEIVED PRIOR TO THE DATE AND TIME SET FORTH WILL BE RETURNED TO THE BIDDER UNOPENED.