CURRENT OPEN SOLICITATIONS

List of Current Solicitations
RFQS 6100 CLMA031  View Details
Due Date: 08/29/2019
Existing Terminal Centralized BHS Upgrades
An upgrade to the existing baggage handling system that will improve airport flow of baggage and passengers, support TSA efficiency, and the future growth of the airport.
IFB 6100 CLMC685B  View Details
Due Date: 08/22/2019
Zilker Metro Park Barton Creek Trailhead Restroom & Water Qu
Provide materials for and construction of a restroom facility adjacent to the Zilker Hillside Theater, site work to create storm water treatment for improved water quality; curb, gutter and asphalt demolition; new curb and gutter installation and walkway connections
IFB 6100 CLMC747  View Details
Due Date: 08/22/2019
Harold Court Nichols Building Renovations
The Work consists of interior and exterior improvements to the Harold Court Nichols Building. The project will require re-using the existing metal building structure to create additional office and meeting spaces by enclosing existing open bays. Scope will include MEP systems involving additional restrooms/shower/locker facilities along with new HVAC system. Other work includes a new metal roofing system, and a new metal entry canopy with limited outdoor green space. Existing offices will require new finishes. This project is to meet LEED Silver major renovation certification. This is a 2 phase construction project.
RFP 1100 JMF3002  View Details
Due Date: 08/20/2019
Generator Hydrogen Fast Purge Systems, Sand Hill
Purchase and install of emergency purge system for Sandhill Unit 5.
RFQS 6100 CLMA029  View Details
Due Date: 08/15/2019
Fire and EMS Stations Rebuild and Renovations
AFD #1 -building renovation and upgrades; AFD #3 - repairs to building and upgrade bays; AFD #22 - design and construction of new replacement station
IFB 6100 CLMC751  View Details
Due Date: 08/15/2019
Local Mobility ADA Sidewalk & Ramp IMPS Grp22 Citywide-IDIQ
Construction of sidewalks and ADA (Americans with Disabilities Act) ramps to implement the Sidewalk Master Plan and ADA Transition Plan. Scope may also include Active Transportation projects.
IFB 7200 AHFC19002  View Details
Due Date: 08/08/2019
AHFC IDIQ FOR Private Lateral Construction Program
AHFC IDIQ Private Lateral Program
IFB 6100 CLMC753  View Details
Due Date: 08/08/2019
Local Mobility ADA Sidewalk & Ramp IMPS Grp 23 C
Construction of sidewalks and ADA (Americans with Disabilities Act) ramps to implement the Sidewalk Master Plan and ADA Transition Plan. Scope may also include Active Transportation projects.
IFB 6100 CLMC752  View Details
Due Date: 08/01/2019
Local Mobility ADA Sidewalk & Ramp IMPS Grp 24 Citywide IDIQ
Construction of sidewalks and ADA (Americans with Disabilities Act) ramps to implement the Sidewalk Master Plan and ADA Transition Plan. Scope may also include Active Transportation projects.
IFB 6100 CLMC745  View Details
Due Date: 08/01/2019
Walnut Crk WW Treatment Plant Sludge Thickener Rehabilitatio
The Work consists of demolition and rehabilitation of the existing gravity sludge thickener; complete demolition and replacement of the existing thickened sludge pump station; construction of a new electrical building; and replacement of existing yard piping.
IFB 6100 CLMC746  View Details
Due Date: 08/01/2019
Major Transportation Infrastructure Improvements - IDIQ
Major roadway infrastructure improvements such as at intersections or mid-block treatments related to construction of medians, sidewalks, shared use paths, bicycle facilities, pedestrian ramps, turn lanes, signing and striping, associated paving, inlet and drainage improvements, associated signal infrastructure and, miscellaneous roadway treatments.
CSP 7200 AHFC19001  View Details
Due Date: 07/25/2019
AHFC JOB ORDER CONTRACTING
Austin Housing Finance Corporation (AHFC), seeks proposals from qualified contractors to perform new construction, reconstruction, minor construction, repair, remediation, rehabilitation, modification or alterations of AHFC or private residential structures on a Job Order Contracting (JOC) basis. This contract will be used to support AHFC’s federal programs including Community Development Block Grant (CDBG) funds from the United States Department of Housing and Urban Development (HUD). The Contractor must agree to comply with all federal, state and local requirements that are applicable to these programs. AHFC anticipates selecting up to five (5) qualified contractors for a two (2) year period and has the option to extend the contract term for three (3) additional one (1) year terms.
IFB 6100 CLMC733  View Details
Due Date: 07/25/2019
Southland Oaks Wastewater Improvements
The work shall consist of installing 2,800 linear feet of 30 inch wastewater gravity main, 16 Polymer concrete manholes, I box manhole, erosion repair and installation of 270 cubic feet of dry rip rap with 340 square feet of limestone block grade controls.
Important Notices
The State of Texas has enacted a new law that concerns Vendors doing business with local governments effective January 1, 2006. All Vendors must now register with the City of Austin before they submit a bid or proposal. Please take the time to read the information in the Conflict of Interest Disclosure: http://www.austintexas.gov/department/conflict-interest-questionnaire.
City of Austin employees may not accept any gifts from vendors. Please do not offer or provide gifts or favors to City employees or to City offices. This includes paying for meals.
On October 2, 1995, a revision to the City's Minority Business Enterprise (MBE) / Woman-owned Business Enterprise (WBE) / Disadvantaged Business Enterprise (DBE) Ordinance became effective.
The Ordinance establishes new goals for MBE / WBE / DBE Participation. Bidders are required to document efforts to solicit MBE / WBE / DBEs in the Compliance Plan. The Goals for each project and the instructions and forms for the Compliance Plan are included in the MBE / WBE / DBE Program Packet included in the solicitation. For construction contracts, the MBE / WBE / DBE Program Packet is a separately bound volume of the Project Manual.
On June 14, 2018, Council repealed and replaced Article 6 of Chapter 2‐7 Anti‐Lobbying and Procurement. Please read the new ordinance here.
ALL BIDS AND COMPLIANCE PLANS NOT RECEIVED PRIOR TO THE DATE AND TIME SET FORTH WILL BE RETURNED TO THE BIDDER UNOPENED.