CURRENT OPEN SOLICITATIONS

List of Current Solicitations
IFB 6100 CLMC765  View Details
Due Date: 12/19/2019
Brentwood/Arcadia Avenue Water and Wastewater Pipeline Renew
The work consists of replacing existing deteriorated or undersized water & wastewater lines within the ROW. Water system upgrades include approx. 10,187 LF of 6".8" and 12 inch PVC pipe and all services & appurtenances. Wastewater system upgrades include aprox. 7,309 LF of 8" and 12 inch PVC pipe, manholes and service connections. Wastewater upgrades also include lining of 1212 LF of concrete pipe by cured in place lining method (CIPP).
IFB 6100 CLMC767  View Details
Due Date: 12/19/2019
Water Meter Upgrades (Phase 2) 3inch Diameter & Larger IDIQ
The Work generally consists of providing the following services, including but not limited to: Replacement and repair related to large water meter installations/exchanges specifically the individual components thereof such as meters, valves, bypass lines and piping both inside and outside of the vault, the vault, and vault lids. Water meters to be provided by OWNER and installed by CONTRACTOR. CONTRACTOR will have some potholing and planning to provide layout drawings showing scope of work for each Work Assignment.
IFB 6100 CLMC760  View Details
Due Date: 12/19/2019
North Austin Reservoir and Pump Station Improvements
The project includes decommissioning the existing infrastructure at the North Austin reservoir and pump station and constructing a new North Zone Pump Station and ground storage reservoir.
IFB 6100 CLMC739  View Details
Due Date: 12/12/2019
South Austin Regional WWTP Electrical Substation No.1 Replacement
The Work consists of, but is not limited to, installation of a new Substation No. 1 Building housing proposed medium voltage power distribution equipment, with associated instrumentation and controls, auxiliary power, and HVAC system. The project also entail renovation to the plant site medium voltage power distribution duct bank system for distribution of power to various process areas in the plant.
RFQS 6100 CLMA030  View Details
Due Date: 12/11/2019
Dove Springs Public Health Facility
Design and build a new public health center in the Dove Springs neighborhood
Important Notices
The State of Texas has enacted a new law that concerns Vendors doing business with local governments effective January 1, 2006. All Vendors must now register with the City of Austin before they submit a bid or proposal. Please take the time to read the information in the Conflict of Interest Disclosure: http://www.austintexas.gov/department/conflict-interest-questionnaire.
City of Austin employees may not accept any gifts from vendors. Please do not offer or provide gifts or favors to City employees or to City offices. This includes paying for meals.
On October 2, 1995, a revision to the City's Minority Business Enterprise (MBE) / Woman-owned Business Enterprise (WBE) / Disadvantaged Business Enterprise (DBE) Ordinance became effective.
The Ordinance establishes new goals for MBE / WBE / DBE Participation. Bidders are required to document efforts to solicit MBE / WBE / DBEs in the Compliance Plan. The Goals for each project and the instructions and forms for the Compliance Plan are included in the MBE / WBE / DBE Program Packet included in the solicitation. For construction contracts, the MBE / WBE / DBE Program Packet is a separately bound volume of the Project Manual.
On June 14, 2018, Council repealed and replaced Article 6 of Chapter 2‐7 Anti‐Lobbying and Procurement. Please read the new ordinance here.
ALL BIDS AND COMPLIANCE PLANS NOT RECEIVED PRIOR TO THE DATE AND TIME SET FORTH WILL BE RETURNED TO THE BIDDER UNOPENED.