Shoal Creek Restoration 15th - 28th
- Project Schedule
- Phase 1 Construction Map
- Phase 2 Construction Map
- Phase 3 Construction Map
- Phase 4 Construction Map
- Project Overview
- Park Use Integration Plan
- Existing Creek Erosion
- Creek Stabilization
- Bank Stabilization Photo Simulation 1
- Bank Stabilization Photo Simulation 2
- Creek Crossing Photo Simulation
- Water Quality Enhancements
- Vegetated Swales Photo Simulation
- San Gabriel Biofiltration Pond
- Riparian Restoration A (Pedestrian Bridge to Volleyball Courts)
- Riparian Restoration B (Volleyball Courts to 24th Street)
- Riparian Restoration C (24th Street to Gaston Blvd)
- Riparian Restoration Photo Simulation
- Trail and Park Access Improvements
- Lamar Bike Trail at 24th Street Photo Simulation
- Wastewater Line Relocation Features
- Proposed Manhole Locations