This project will stabilize and restore approximately 800 feet of Little Walnut Creek, south of Park Plaza.
Overview
Erosion has damaged the northern bank of Little Walnut Creek and is threatening several multifamily homes, a commercial parking lot, and an exposed wastewater line. The project will protect homes, yards, and infrastructure by stabilizing the stream bank.
Benefits
Stabilize eroding creek banks
Improve wildlife habitat and restore creek health
Protect private properties and public infrastructure from future damage
Presentation
This presentation discusses the problems erosion is causing and the techniques we will use to stabilize the creek bottom and banks. A recording of the presentation is below or you can look through the PowerPoint slides.
Status and Timeline
Our capital improvement process includes the following phases:
Preliminary Engineering – when a solution is identified and costs are estimated.
Design – when the details are worked out and construction plans drawn up.
Permitting and Bidding – when a contractor is hired and all permits are acquired.
Construction – when the project is built.
This project is currently in the construction phase.