This project will stabilize and restore approximately 800 feet of Little Walnut Creek, south of Park Plaza. 

Overview 

Erosion has damaged the northern bank of Little Walnut Creek and is threatening several multifamily homes, a commercial parking lot, and an exposed wastewater line. The project will protect homes, yards, and infrastructure by stabilizing the stream bank.

Map showing project area

Benefits 

  • Stabilize eroding creek banks 
  • Improve wildlife habitat and restore creek health 
  • Protect private properties and public infrastructure from future damage 

Presentation

This presentation discusses the problems erosion is causing and the techniques we will use to stabilize the creek bottom and banks. A recording of the presentation is below or you can look through the PowerPoint slides.

Status and Timeline 

Our capital improvement process includes the following phases: 

  • Preliminary Engineering – when a solution is identified and costs are estimated. 
  • Design – when the details are worked out and construction plans drawn up. 
  • Permitting and Bidding – when a contractor is hired and all permits are acquired. 
  • Construction – when the project is built. 

This project is currently in the construction phase. 

Erosion along creek at Park Plaza

Questions?

Please reach out to Madison Cooper, P.E., at 512-974-3496 or send Madison an email.