Austin Parks and Recreation

Person walking a dog on a paved trail by a river lined with trees

Dougherty Arts Center Redevelopment Project

An illustration detailing the four major exit and entry points of the Dougherty Arts Center in a site plan proposed in 2022.

City Council District 9

Project Summary

Austin Parks and Recreation sought to take steps toward moving the Dougherty Arts Center out of the beloved naval center and into a newly envisioned building to be constructed on Butler Shores Park. This project is in the design document phase.

Background

Built in 1947 as a Naval and Marine Reserve Center, the Dougherty Arts Center (DAC) was dedicated to the City and named for the late arts advocate Mary Ireland Graves in 1978. Since then, the DAC has been offering arts experiences for a broad audience through its three main components: The Dougherty Theater, Julia C. Butridge Gallery and the Dougherty Arts School.

As identified in a conditions assessment completed in 2010, the DAC building is beyond repair. The building was established as a temporary structure meant to be razed in the 1970s but was adopted as a permanent home that has outlived its viability. Austin Parks and Recreation (APR) sought to provide a new facility in order to continue to provide arts center services in a safe, healthy and sustainable environment. This project followed a 2018 community engagement process and City Council direction in spring 2019.

See the Vision

 

Project Description

The project is currently in the design phase for the replacement of the existing DAC at a new location in Butler Shores Park. Funded by the 2018 Bond Proposition B, the new DAC facility will build on the existing core arts programs in an improved environment that can better accommodate Austin’s significant demand for affordable access to arts services. The conceptual planning and programming documents developed in 2018 with community consultation serve as the basis for this project.

Objectives

The goals for this project will build on the DAC’s mission: to support emerging through established artists who create, showcase and experience the arts first hand. APR envisions the DAC as Austin’s cultural living room, where people of all ages, races, ethnicities, abilities, genders, sexual orientations, socio-economic statuses, nationalities and religions gather to create community through the arts. Additional project goals identified in the planning phase include, but are not limited to:

  • Develop the surrounding parkland consistent with the vision for the Butler Shores and Cultural Arts District;
  • Strengthen trail connections and activating parkland through outdoor education, play and performance amenities;
  • Consider alternatives for pedestrian and vehicular circulation, site access and parking; and
  • Demonstrate high achievement in sustainable design for architecture and landscape.

Communication and Engagement

Date

Event

Location

Materials

April 25, 2022Design UpdateVirtual

Meeting Recording

Meeting Presentation (PDF, 8.7 MB)

Funding and Resources

Primary funding comes from the 2018 Bond Proposition B. Read the Memo to City Council (PDF, 196kb), January 26, 2022, discussing funding challenges.

Contact Information

For more information, please contact Tony Hron, Project Manager, at DACproject@austintexas.gov or by phone at (512) 974-9469.

Previous Projects

2018 Communications and Engagement

    The DAC has been the focus of multiple studies which determined that the redevelopment at the current site, due to its location within the floodplain and atop a former landfill, is seen as prohibitive from a both a practical application and cost impact. APR has and continues to investigate feasible opportunities for the facility’s redevelopment.

    Currently, there is one site on City of Austin parkland being considered – the site at Butler Shores. Potential benefits of the Butler Shores site include:

    • Site is within reasonable proximity and service area of existing facility
    • DAC Adjacency to APR Main Administrative Office Proximity to and potential partnership opportunities with the ZACH Theatre
    • Opportunity to improve parkland adjoining the APR Main office and new DAC
    • Opportunity for shared structured parking facility
    • Opportunity to enhance Toomey Road streetscape and pedestrian connectivity to Zilker Park Consistent with recommendations in Town Lake Park Comprehensive Plan and Imagine Austin Comprehensive Plan
    • Site is City of Austin Parkland and properly zoned for construction of a parks facility.
    • Video in English | video en español
    DateEventLocationMaterials
    June 21, 2018Community Open House 1Dougherty Arts Center

    Flyer (PDF, 1 MB)

    Open House Sign-In (PDF, 3 MB)

    DAC Community Survey: English (PDF, 694 KB) / Spanish (PDF, 722 KB)

    Comment Cards (PDF, 6 MB)

    Fact Sheet: English (PDF, 250 KB) / Spanish (PDF, 284 KB)

    Media Kit Press Release: English (PDF, 165 KB / Spanish (PDF, 157 KB)

    Public Meeting Presentation Board (PDF, 3 MB)

    September 19, 2018Community Open House 2Zilker Botanical Gardens

    Flyer (PDF, 1.5 MB)

    Open House #2 Sign-In (PDF, 771 KB)

    Open House #2 Comment Cards (PDF, 814 KB)

    September 19, 2018 Public Meeting Presentation Boards (PDF, 8.5 MB)

    DAC Community Survey Report (PDF, 1 MB)

    Design Phase 2020-2021

      DAC-plan-2021-05-21
      Preliminary design approved by City Council, May 2021

      Community engagement for the design phase began in October 2020, and the project team presented three site alternatives in early 2021. APR connected with audiences who already interact directly with the Dougherty Arts Center as well as decision-makers or individuals and organizations representing more extensive fields of interests or concerns. This engagement process also sought other communities who will be a part of DAC's future, building on the engagement from 2018.

      DateEventLocationMaterials
      October 28, 2020Community Meeting 1Virtual

      Presentation (PDF, 9 MB)

      Zoom meeting recording

      Meeting Summary (PDF, 596 KB)

      November 10, 2020Small Group Meeting: DAC StaffVirtualMeeting Recording
      November 19, 2020Small Group Meeting: Adult Painting, Drawing and PhotographyVirtualMeeting Recording
      December 1, 2020Small Group Meeting: Youth Program ParticipantsVirtualMeeting Recording
      December 2, 2020Small Group Meeting: Gallery ArtistsVirtualMeeting Recording
      December 3, 2020Small Group Meeting: Artist Professional DevelopmentVirtualMeeting Recording
      December 7, 2020Small Group Meeting: Theater OrganizationsVirtualMeeting Recording
      December 9, 2020Small Group Meeting: Friends of the DACVirtualMeeting Recording
      December 10, 2020Small Group Meeting: Adult CeramicsVirtualMeeting Recording
      December 15, 2020Small Group Meeting: Toomey Road Friends and NeighborsVirtualMeeting Recording
      January 4, 2021Community Survey ClosedOnlineSurvey Results
      January 7, 2021Small Group Meeting: Equity in ArtsVirtualMeeting Recording
      January 26, 2021Community Meeting 2Virtual

      Presentation (PDF, 12 MB)

      Meeting Summary (PDF, 498 KB)

      After the community engagement process above, the project team presented to the following City of Austin boards, commissions, and City Council:

      These meetings were made available to the community and allow for participation. Click the link to the desired meeting for more information:

       
      DACR-logo