Krieg Athletic Complex Reclaimed Water Line Project
Austin Water is replacing a reclaimed waterline at Krieg Athletic Complex. The sand volleyball courts and a part of the parking lot will be closed, and the trail will be rerouted during the project, anticipated to be completed in May 2027.
Austin Water Project Page Sign Up for Project Updates Parks and Recreation Volleyball Courts
City Council District 2
Background
In 2015, the Halloween floods destroyed the pedestrian bridge that crossed Country Club Creek and the original 6-inch diameter recycled water line that was attached to the bridge. The recycled water line allows Parks and Recreation to irrigate the fields with recycled water, supporting responsible water usage.
Project Description
This project will reconnect the recycled water irrigation line that was servicing ballfields and green areas at Krieg Athletic Complex, 515 S. Pleasant Valley Road, with the existing recycled water line on the Roy G. Guerrero Metropolitan Park side of Country Club Creek. The new recycled water line will be installed hydraulically below grade (underground) to avoid trenching and disturbance of park amenities.
In addition to the installation of the recycled water line and reconnection, we will remove a damaged water line that is currently below the sand volleyball courts. The removal of this water line will require us to close the volleyball courts to dig out the current damaged line and install the new drain line. Once the drain line is installed, the volleyball courts will be restored to original condition.
All dates are estimates and subject to change
Anticipated Schedule
- Notice to Proceed: July 20, 2026
- Anticipated Completion: May 2027
Contact Information
James Mendez, Project Manager
Austin Capital Delivery Services
512-974-3662
james.mendez@austintexas.gov
Jesus Cabello, Construction Inspector
Austin Capital Delivery Services
512-978-0745
jesus.cabello@austintexas.gov
Lydia Van Buren, Public Information Office
Austin Water
512-972-0268
lydia.vanburen@austintexas.gov
Rey Hernandez, Park Development Project Manager
Austin Parks and Recreation
512-974-9464
reynaldo.hernandez@austintexas.gov